Checked the site on Friday 28th July - noted the following -
- the brickies had finished the window sills, and finally installed the entrance overhead support beam.
- the brickies had finished the LHS wall to second level
- vandal-damage remains intact. Assume this will be fixed once scaffolding comes down
- the brickies had tidied up the site, broomed the floor and tossed all rubbish into a gigantic pile at front of property
- site is now ready for next step - either plumbing, weatherboard, or ceiling strut installation (requires a crane)
- I'd assume there is a rubbish pickup scheduled, as there are 3 pallets of bricks in the way of everything
- stairs remain to be built