Tuesday 25 April 2017

Frame update - 26th April 2017


Update 31st March 2017 - Window frames arrive

They laid them all over the mud front yard. Not great. Damaged the door frame a bit in the process.




 
Here's some pics of the layout -





Here's a pic of the front door jamb, and the cable conduit specs -




Update 10th April 2017 - Fence falls over

Damaged the alfresco sliding door when the fence fell on it, as well as one of the larger windows. Masterton have agreed to replacing the door at their cost.


Here's where the fence hit the door frame

 
And here's the window (large) and a piece of the door runner that I found in the mud -


Update 18th April 2017 - Frame gets constructed

Truck turns up in the morning. Frame as constructed by the night. No ceiling trusses as yet -


Side view from garage, then view from media room out -


Panoramic of the back room including kitchen -


Hallway, and another shot of the door frame after the fence was replaced -


Shot from outside to the media room -


Update 19th April - 26th April 2017 - no activity at all

No-one has been back since that first day of activity. And the weather has been perfect every day.